• Home /Exam Details (QP Included) / Incineration of Union Carbide trash begins at Pithampur plant.
  • Incineration of Union Carbide trash begins at Pithampur plant.
    Posted on May 8th, 2025 in Exam Details (QP Included)

    • Incineration of 307 tonnes of waste from the defunct Union Carbide factory in Dhar district, Madhya Pradesh, started on Monday.

    • The process is being carried out at a disposal plant in Pithampur, 250 km from Bhopal.

    • Waste is being burnt at a maximum rate of 270 kg per hour under the supervision of technical experts.

    • The entire waste of Union Carbide is expected to be burned to ashes within 50 to 55 days.

    • Emissions from the plant are being monitored through an online system.

    • Mercury emissions are being monitored for the first time online.

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    This site uses Akismet to reduce spam. Learn how your comment data is processed.

     WBCS Foundation Course Classroom Online 2024 2025 WBCS Preliminary Exam Mock Test WBCS Main Exam Mock Test WBCS Main Language Bengali English Nepali Hindi Descriptive Paper