India’s First Bullet Train Project Progress
• Railway Minister Ashwini Vaishnaw announced the progress of India’s first bullet train project.
• The 50-km stretch between Surat and Bilimora in Gujarat is set to open in 2027.
• The entire Mumbai-Ahmedabad corridor is expected to be operational by 2029.
• The high-speed train will cover the 508-km distance between Mumbai and Ahmedabad in just two hours and seven minutes.
• The main line has been designed for speeds up to 320 kmph, with 80 kmph for the loop line.
• Advanced technologies have been deployed to ensure safety and efficiency.
• The project will link economies of all major cities along the route, similar to the growth in Japan after the Shinkansen’s launch.
• The BJP has promised to expand the network with three more corridors planned in the north, one in the east, and one in the south.
Mumbai-Ahmedabad Bullet Train is important topic for Civil service exam (WBCS).
🚨Daily Current Affairs MCQ pdf download- Google Drive Link https://drive.google.com/drive/folders/1PN6A2mDkCngLsGR115zhZ_vTV8W7AKN8?usp=drive_link
✅Telegram channel link: https://t.me/TheSoumyaSir
✅Attempt the daily current affairs test in our free section of app (android and ios) : https://play.google.com/store/apps/details?id=co.iron.rrnvu
✅ Interview related telegram group https://t.me/IASWBCSInterview 🔥 Book free consultation with WBCS Gr A Officer: https://bit.ly/Free-Appointment-with-Soumya-Sir-Other-WBCS-A-Officer
✅ Courses https://www.wbcsmadeeasy.in/courses/
✅ Attempt previous years questions : Link: https://bit.ly/wbcs-pyq-wbcsmadeeasy
✅ Take subject wise Chapterwise mock test : https://bit.ly/wbcs-prelims-all-subjects-chapter-wise-test
✅ Bio – https://bit.ly/m/wbcs-made-easy
✅ App download – Android: https://play.google.com/store/apps/details?id=co.iron.rrnvu&pcampaignid=web_share (iOS available too)
WBCS MADE EASY www.wbcsmadeeasy.in
8274048710/8585843673
Jawahar IAS www.jawaharias.in
7439954855